Tintenbar to Ewingsdale Pacific Highway Upgrade


Description

Project Overview
RMS Project, consisting of approximately 16.3km of dual lane carriageway connecting the existing pacific highway at Tintenbar and Ewingsdale.

Scope of Works

  • Construction of Reinforced Soil Walls, to Skinners Creek. Wall area in excess of 1000m2 with works including panel installation, placement and compaction of backfill material and general earthworks in and around soil wall.
  • Construction of Techspan Arch to Jarrets Lane. Arch span >10.0m and around 8.0m high and 50m long. Works include placement of RSW panels to arch, placement and compaction of backfill and general earthworks in and around soil wall.
  • Road works to local road including bulk earthworks, stormwater drainage, pavement construction, kerb and guttering and minor concrete works.
  • Storm water drainage works including network lines 375-750mm diameter including stormwater pits, lintels and grates, installation of gross pollutant traps and headwall outlet structures.

 