Stroud Road – Batter Slope Stabilisation


Project Overview
Batter Stabilisation works to a small section of works along the Buckets Way damaged in a heavy rainfall event.

Scope of Works

  • Management of traffic throughout duration of works by implementing a traffic control plan for the different stages of the stabilisation works.
  • Excavation and removal of failed batter slope material. Material consists of existing rock work and VENM soil which has failed. Material to be disposed offsite at the local council tip.
  • Trim and shape the rear face of the excavated batter.
  • Installation of 4.0m long galvanised soil nails. Bar diameter 25mm in a 100mm diameter drill hole.
  • Supply and installation of 100mm THK 40Mpa shotcrete (approximate area 60M2).