Brushy Mountain – Batter Slope Stabilisation


Description

Project Overview
Batter Stabilisation works to a section of works along the Buckets Way, near Gloucester damaged in a heavy rainfall event.

Scope of Works

  • Management of traffic throughout duration of works by implementing a traffic control plan for the different stages of the stabilisation works.
  • Installation of 6.0 & 4.0m long galvanised soil nails. Bar diameter 25mm in a 100mm diameter drill hole. Work carried out from EWP using small drill mast.
  • Supply and installation of rock fall mesh to soil nails.

Project details