Chaffey Dam Upgrade

Chaffey Dam Upgrade

Chaffey Dam Upgrade

Project Overview Stage Two of the Chaffey Dam Augmentation and Safety Upgrade involves raising the dam wall by approximately six metres and subsequent works to raise the Morning Glory. Scope of Works Construction of Reinforced Soil Walls, to dam crest Panel Installation wall area in excess of 7000m2 Placement and […]

Read more

Pacific Highway Upgrade – Oxley to Kundabung

Pacific Highway Upgrade Oxley to Kundabung

Pacific Highway Upgrade Oxley to Kundabung

Project Overview RMS Project, consisting of dual lane carriageway connecting the existing pacific highway at Oxley to Kundabung. Scope of Works Construction of Reinforced Soil Walls. Wall area in excess of 850m2 with works including panel installation, placement and compaction of backfill material and general earthworks in and around soil […]

Read more

National Circuit – Temporary Ground Anchors

Project Overview Installation of 121 Temporary Ground Anchors Scope of Works Supply of all materials for temporary ground anchors Fabrication onsite of temporary ground anchors Drill and install temporary ground anchors

Read more

50 Crebert Street Mayfield – Kingston Building

Project Overview Extension of the Catholic Dioceses Facility at Mayfield. Scope of works included the formwork, reinforcing and Shotcreting to the Bored Pile Wall. Client Australian Foundation and Drilling Solutions Scope of Works Installation of shotcrete- wood float finish between bored concrete piles.

Read more

Tintenbar to Ewingsdale Pacific Highway Upgrade

Tintenbar Tunnel

Tintenbar Tunnel

Project Overview RMS Project, consisting of approximately 16.3km of dual lane carriageway connecting the existing pacific highway at Tintenbar and Ewingsdale. Scope of Works Construction of Reinforced Soil Walls, to Skinners Creek. Wall area in excess of 1000m2 with works including panel installation, placement and compaction of backfill material and […]

Read more

Stroud Road – Batter Slope Stabilisation

Project Overview Batter Stabilisation works to a small section of works along the Buckets Way damaged in a heavy rainfall event. Scope of Works Management of traffic throughout duration of works by implementing a traffic control plan for the different stages of the stabilisation works. Excavation and removal of failed […]

Read more

Shortland to Sandgate Bypass

Project Overview Upgrade / Extension of the existing dual lane carriage way at Sandgate connecting to Maitland Road at Shortland. Scope of Works Shotcrete works to bored pile wall including site preparation, scale and cleaning piles, supply and placement of steel fibre reinforced shotcrete. Epoxy injection to Bridge bearings. Pressure […]

Read more

Lake Macquarie Private Hospital – RDOC Extension

Project Overview Extension of the existing Lake Macquarie Private hospital to accommodate a new radiology centre. Scope of Works Installation of steel walers and permanent ground anchors. Installation of temporary ground anchors. Installation of shotcrete- wood float finish between bored concrete piles.

Read more

Brushy Mountain – Batter Slope Stabilisation

Project Overview Batter Stabilisation works to a section of works along the Buckets Way, near Gloucester damaged in a heavy rainfall event. Scope of Works Management of traffic throughout duration of works by implementing a traffic control plan for the different stages of the stabilisation works. Installation of 6.0 & […]

Read more